I riveted the GTN attachment bracket, then riveted the GTN opening doubler:
![]() |
| Subpanel structure with doubler attached around hole |
I then added grommet edging around the GTN/GNX hole (which took a long time because Spruce was backordered on the SL3, which is the right one for the panel+doubler's thickness):
![]() |
| Subpanel GTN hole with edge grommet |
Total upper forward fuselage install rivets: 62
Total upper forward fuselage install time: 20.2h


No comments:
Post a Comment