Before final attachment of the engine mount or brake hoses, but after insulating the bottom of the firewall, we riveted the oil cooler box and insulated it:
Oil cooler box riveted to the firewall through the titanium foil |
Once all insulation is done, we'll actually reattach the engine mount and hang the engine for good.
Time lapse:
Total engine installation rivets: 63
Total engine installation time: 14.4h
No comments:
Post a Comment