Tailcone avionics mounting

I added a lightening hole to the avionics shelf (keeping its edge about 3/4" from the nearest screw holes):

Tailcone avionics shelf with a lightening hole removed with the fly cutter

and then riveted the left shelf nutplates in place (for the contactors):

Left-side shelf with nutplates riveted on

I drilled holes for an AN366F nutplate on the bellcrank mount to use as the main grounding point, only to realize that the edge of the nutplate would collide with the bellcrank rib:

Battery mount bracket with nutplate hole for grounding point, one rivet hole going beyond the edge of the underlying part

Many facepalms later (if only I had shifted the position just a bit...), the solution I picked was to switch to a MS21081-4 corner nutplate, which can still use two of those holes (that nutplate also seems relatively hard to find, so I ordered mine from a shop in Alaska!):

Battery mount bracket with a 90-degree nutplate to stay clear of the underlying part

With that in place, I removed primer from the surface that will have contact with the washer, for better conductivity:

Battery mount grounding point with primer removed

I then re-assembled the whole thing, re-connected the pushrod, attached the servo mounts, etc.:

Tailcone area with battery mount, left shelf, and servo brackets back in place

The only real steps left for this section are to final-install the contactors and batteries.

Time lapse:


Total tailcone rivets: 1904
Total tailcone time: 243.4h

Door seal slot forming

I have a lot of videos of work done 1y+ ago, so instead of trying to wait for those to accumulate into longer videos/posts, I'll start posting them.

Last year, we used some of the remaining McMaster 1120A313 seal to form the edge slots, and got the 1120A311 seal to actually install later:

Temporary door seal in place to form an attachment slot

Next steps on the door will be possible once the cabin cover is attached.

Time lapse:


Total cabin door rivets: 142
Total cabin door time: 188.3h

Wheel fairing primer, reassembly and nose gear leg fairing mistake

The wheel fairing brackets had lost quite a bit of primer on their tips from the fitting and filling process, so we touched that up, along with priming a few other parts for other sections:

Fairing brackets and other parts ready for primer (just touching up the brackets)

Fairing brackets and other parts after primer

I then riveted the nutplates to those brackets and reinstalled the brackets and the wheels (hopefully for the last time):

Fairing brackets with nutplates riveted on

Wheel and fairing bracket reinstalled in place

Wheel and fairing bracket reinstalled in place

I also started making progress on attaching the nose gear leg fairing, which was going quite well...until I trimmed the hinge to the specified size (31 1/2") and it was sticking out even though it was supposed to fit inside the fairing...that's when realized I applied the cutting template in the wrong location, and the 27 1/32" distance from the tangent point to the edge of the aft opening was actually 24" instead :( I went back to the video of when I did it, and looks like I aligned the 27" mark with the aft end of that opening rather than the forward one - which is not exactly the error that the manual warns ("Double check that the measurement was taken to the cutout (shaded area) and not to the forward edge of the template...") but not too different...so I'll get back to this part after I receive a new part from Vans.

Nose gear leg fairing with hinge sticking out

The moment I realized my mistake :(


Time lapse:


Total wheel fairing rivets: 140
Total wheel fairing time: 89.8h

Interior panels accessory progress

I attached the Aerosport pocket cover, using a ruler to keep it flush with the inboard surfaces, and then the cupholder per the instructions (but using locking nuts behind them instead):

Pocket with holes for attachment

Pocket held flush with the inboard surfaces for match-drilling

Pocket and cupholder installed

Pocket and cupholder attachment nuts

I installed the rear vents by first taping the akward-fitting duct to the skin, then opening up the holes on the interior panels to match:

Vent duct taped in place

Interior panel with hole lining up with the vent duct

Interior panels with vents installed

I then aligned and drilled holes for the vent levers, to ensure their aftmost position would shut the vent:

Vent arm attached to vent slides

Vent arm aligned with vent

I also installed most covers on the aft section of the fuselage, since those were done anyway:

Rear seat and baggage areas fully covered

Closed baggage area inspection plate

Time lapse:


Total access cover and floor panel rivets: 596
Total access cover and floor panel time: 50.7h

Wheel fairing attachment

I sanded the nose wheel fairing gap fills to remove all the excess resin:

Sanded nose wheel fairing gap fills

then final-drilled and countersunk the fairing attachment holes:

Fairing attachment holes countersunk for tinnerman washers

While sanding the gap fills inside the fairing, I got carried away with the Dremel and, not seeing the surface due to the generated dust, ended up poking another hole through the fairing - oops - so I had to patch that up (used 2 layers of fiber on each side of it):

Unintended hole, sanded for patching

I then final-drilled the wheel fairing joint holes and installed all the nutplates that hold the halves together, countersinking for tinnerman washers:

Wheel fairing with joint nutplates installed

Main wheel fairing held together with screws and tinnerman washers

Now that the wheel fairing alignment and rilling is completed, I also removed the main fairing brackets to provide additional clearance from the gear leg, and drilled and countersunk all the nutplate attachment holes:

Main wheel fairing attachment bracket, trimmed to provide clearance from the gear leg

Fairing attachment brackets, with nutplate holes countersunk

Besides the nose leg fairing, now there's only some finishing work to do on this section, notably the joint to the intersection fairings, touching up the primer on those brackets, installing the bracket nutplates and installing the tug guards.

Time lapse:


Total wheel fairing rivets: 108
Total wheel fairing time: 84.4h

Gear leg and nose wheel fairing progress

We aligned the leg fairings and started match-drilling the intersection fairings:

Aligning the gear leg fairing with a laser and plumb bob

Intersection fairing around aligned gear leg fairing

Both intersection fairings match-drilled around aligned gear leg fairing

At this point, it became clear how bad the Vans molds really are - the top ones don't even sit flush when clecoed at two points, and I was still going to have to add more fiberglass layers and finish them - so I stopped and bought the RVBits ones :) those weren't perfect, but were a bit better and were definitely well finished:

Match-drilled RVBits intersection fairing

Match-drilled and enclosed intersection fairing

To bond the bottom intersection fairings to the wheel fairings, we sanded the wheel fairings underneath it, then used resin and flox:

Sanding intersection fairing bonding area

Sanded intersection fairing bonding area

Bonded intersection fairing

Aft wheel and split intersection fairing after bonding

Forward wheel and split intersection fairing after bonding

We then continued with the nose wheel fairing, by filling the gaps around the screws, which was again more challenging than it looks due to the enclosed space:

Filling gaps inside the nose gear fairing

The above obviously gave poor results, but that was then easy to fix on the bench, now that we had a minimal barrier to tighten the screws against:

Nose gear fairing with gaps partially filled

Filling remaining nose gear fairing gaps

Nose gear fairing brackets with re-filled gaps

I also countersunk the tug guards for riveting:

Tug guards with countersunk holes

Next is the nose gear leg fairing and finishing of the nose wheel fairing and intersection fairings.

Time lapse:


Total wheel fairing rivets: 60
Total wheel fairing time: 69.7h

More avionics mounting

Since I had moved the essential bus bar one hole lower, I added the new bottom hole and nutplate (keeping the top hole for the fuel pump relay):

Additional hole for essential bus bar 

I also added nutplates for #8 screws to hold the main wiring harness through adel clamps, underneath the right side flange:

Panel with nutplates for holding the main wiring harness

Alternator regulators attached to panel ribs

Attaching FlyEFII ECUs to the panel ribs

FlyEFII ECUs and display turned on

FlyEFII ECUs attached to panel ribs

FlyEFII connectors attached to firewall

FlyEFII ECUs with connectors attached to firewall

For attaching the Bus manager, I used two of the same holes that attach the ECUs, plus another pair of holes for AN3s, and added nutplates (the plastic is pretty thick, and I used soft rivets for those) (I also had no L4 nutplates at hand, so had to order those):

Bus manager cover attached to mounting angles

Bus Manager cover with nutplates attached

Last but not least, I trimmed the side of the mounting angle to allow airflow out of the Bus Manager:

Bus manager mounting angle, trimmed for the fan opening

I finally obtained a CO Guardian 455, so I had to cut a hole for it on the bottom center insert - I laser-cut a template out of acrylic, then used that to cut the carbon fiber + metal insert:

Cutting the CO Guardian template from acrylic

CO Guardian template for cutting the bottom center panel insert

CO Guardian template over the bottom center panel insert

Bottom center panel insert, with opening for the CO Guardian

Bottom center panel insert with CO Guardian 455 installed

I had to slightly adjust the bottom center panel for that to fit:

Bottom center panel, trimmed to fit the CO Guardian

For mounting the GTR20 radio, I made a custom mount similar to the one Vans provides for the wingtip strobes, which lets me mount it in either direction, and attaches to the side of the tailcone:

GTR20 custom mount

GTR20 on the custom mount

GTR20 mount clecoed to the side of the tailcone


Time lapse:


Total avionics rivets: 83
Total avionics time: 87.1h