Tunnel and other covers installed

Once the engine mount was in place, we could finally attach the floor covers:

Forward floor cover panel installed

I also opened a slot on the tunnel cover for wires - I was originally planning to run the wires through it with the cover in place, but after actually doing the tunnel wiring I realized what a royal pain that'd be:

Tunnel cover slot for wiring

Tunnel covers installed in place

Tunnel wires running through the cover

I attached the seat floors for good:

Seat floor installed in place

We also started trimming the forward interior panels, but that'll take some more work to finish.

Time lapse:


Total access cover and floor panel rivets: 650
Total access cover and floor panel time: 61.3h