Panel frame and glareshield cover installed

We fixed the rivet on the panel angle, which turned out to be due to the firewall angle hole being oversized - so we used a CR3243-4-4 oversize cherry rivet to attach it:

Panel angle attached with an oversize cherry rivet

We're using Skybolts instead of hinges for attaching the cowling to the firewall, so I started that by countersinking all the Skybolt flanges:

Skybolt cowl flanges countersunk for riveting

We also installed the glareshield cover, starting with cutting heatsink and cable holes through it:

Trimming the glareshield leather cover

Punching holes in the glareshield cover for attaching fan covers


Fan cover attached to glareshield cover

Glareshield cover installed in place

It was impossible to get the panel frame into place (get the holes to line up) with the thick leather+foam, so we removed the foam from most of the bottom part, which allowed them to fit together:

Removing some of the foam from the bottom side of the glareshield cover

I also opened a small slot on the flange of the panel in order to run the glareshield LED wires (the connectors will be hidden behind the panel frame):

Notch on panel frame to run LED strip wiring

We installed the panel frame in place, and tucked the glareshield cover in:

Panel frame installed permanently, with glareshield cover

I then secured the parking brake cable to the bottom side insert, and we installed it in place:

Bottom side insert with parking brake cable attached to it

Parking brake cable routing behind the panel, avoiding the center pedal bracket

Parking brake cable routing behind the panel

If I knew the whole geometry of this cable run back when I installed the Beringer system and hoses, I'd definitely have placed the parking brake valve in a different location (maybe above the center tunnel, or even on the firewall).

I also had to trim the top edge of the side panel to give avoid the bottom connector from the VP-X (seen above).

Last but not least, we attached the arm rest cover to the center console:

Center console with arm rest cover installed

Inside the center console pocket, underneath the arm rest cover

The main thing left in this section is the cowling attachment, since between this and other sections most of the panel's structure is in place.

Time lapse:


Total upper forward fuselage installation rivets: 153
Total upper forward fuselage installation time: 42.7h

Tunnel and other covers installed

Once the engine mount was in place, we could finally attach the floor covers:

Forward floor cover panel installed

I also opened a slot on the tunnel cover for wires - I was originally planning to run the wires through it with the cover in place, but after actually doing the tunnel wiring I realized what a royal pain that'd be:

Tunnel cover slot for wiring

Tunnel covers installed in place

Tunnel wires running through the cover

I attached the seat floors for good:

Seat floor installed in place

We also started trimming the forward interior panels, but that'll take some more work to finish.

Time lapse:


Total access cover and floor panel rivets: 650
Total access cover and floor panel time: 61.3h

Aileron actuation final assembly

To finish up the aileron actuation section, I installed the main pushrods and the left bellcrank (the right bellcrank had been installed along with the autopilot servo):

Main aileron pushrod attached to bellcrank

Main aileron pushrod attached to wing root torque tube

I also took the opportunity to complete the last step from section OP-38, attaching the springs to the roll trim servo (and then shortening the wires enough that they don't hit the nearby screws:

Trim servo springs attached to aileron pushrod

Trim servo wiring inside the wing

When I mounted the actual aileron in place, I realized that, as it got actuated, it'd rub against the bracket rivets next to it, on both wings - so I replaced those with flush rivets:

Interference between a rivet head and the aileron

Interfering rivets removed and countersunk for flush-head rivets

Flush rivets installed on aileron brackets

I then attached the aileron-to-bellcrank pushrods:

Aileron-to-bellcrank pushrod installed

With that, the only remaining step in section 23 is actually attaching the pushrod to the aileron.

Time lapse:


Total aileron actuation rivets: 44
Total aileron actuation time: 25.4h

Left-side ZipTips installation

I followed the ZipTips manual I wrote for the left wingtip, using the hinge attachment method for the bottom side in order to properly ground the Archer antenna to the wing:

Left wingtip marked from trimming for hinge attachment

Left wingtip attached to top skin

Match-drilling hinge to bottom side of wingtip

Bottom side of wingtip with hinge in place

I modified the Archer NAV antenna for better ILS reception, with the center strip that Martin Renschler designed (and very kindly distributed at Oshkosh):

Archer antenna with ILS addon

The antenna and the hinge were then secured to the wingtip's bottom surface:

Archer antenna and hinge clecoed in place

Archer antenna and hinge riveted in place

I drilled and countersunk the inspection panel's holes (for tinnerman washers), and installed nutplates to secure it:

Inspection panel drilled for attachment

Nutplates installed to hold inspection panel

I match-drilled the forward holes to the light module:

Light module match-drilled in place

At this point, it became evident that the hinge had a problem - it was slightly misaligned, making it nearly impossible to insert the pin :( That'll have to be fixed soon.

Time lapse:


Total wing tip rivets: 423
Total wing tip time: 83.0h

Fire extinguisher installed

I trimmed the corner of the forward seat panel to make it possible to insert and remove it:

Forward seat panel marked for trimming

Inserting the forward seat panel

Forward seat panel fitted in place

We then mounted the fire extinguisher (with a third-party quick-release mount) through the right-side cover and the seat support - this position is out of the way (according to our own testing), yet easy to reach from the pilot seat, and makes the extinguisher gauge easily readable during preflight:

Fire extinguisher mount in place

Fire extinguisher mount attached in place

Seat support showing where the fire extinguisher mount is attached

Fire extinguisher mounted in place

With this, we're on fire! Or at least ready to be.

Time lapse:


Total forward fuselage ribs, bulkheads and bottom skin rivets: 954
Total forward fuselage ribs, bulkheads and bottom skin time: 138.7h

Wing inspection panels installed

The inspection panel countersinks needed to be made a bit deeper, and then we alodined those (turns out the holes are just small enough that I could create a drop of alodine in them to leave them "immersed" for the duration required:

Alodining the inspection panel countersinks

With that done, and a little bit of trimming and edge bending of the inspection panels, we installed them all:

Inspection panels installed

This concludes section 20.


Time lapse:


Total bottom wing skin rivets: 1682
Total bottom wing skin time: 115.7h

Wire/tube bundling and subpanel wrap-up

I bundled all the side wires to the panel:

Side wires bundled up next to panel

We also connected the remaining wires to the alternator regulators, and regretted again installing them behind the subpanel due to the gymnastics required to do this:

Alternator regulator with wires connected to it

Alternator regulators with all wires bundled up and connected to them

Lying upside-down to organize and connect the alternator regulator wires

I also finished installing and torquing the engine grounding straps:

Grounding strap secured to both engine and mount

I tested the LED strip position to see if I'd need to cut it to reduce glare (apparently not), and ran the wire through the panel with the tiniest snap bushing I could find, which turned out to be 0.19" OD. The wires will be hidden between the metal and carbon fiber parts of the panel:

Testing LED strip with white light

Testing LED strip with red light

LED strip wires running through the panel and connected to the strip

The Mountain High O2 system has an emergency O2 valve - the valve itself is in the regulator (attached to the tank), but it's pneumatically actuated (supposedly so it works even in a total electrical failure?), so I had to run the tubes for the emergency O2 switch into the panel:

Emergency O2 control tubes connected to the switch

Emergency O2 control tubes running through the panel to the switch

In case you're wondering if I'm fully done with avionics - of course not :) the wiring never ends...

Time lapse:


Total avionics rivets: 181
Total avionics time: 425.6h