As a very last item in section 41 - when I installed the panel, I didn't know how we'd secure the throttle, prop and heat cables around the pedals, so I left several holes unriveted to have the option of using F-1083 for holding the cables. Since we now know that won't be necessary, I filled those holes that were also shared with the cutout doubler with CherryMax rivets:
![]() |
| Subpanel cutout doubler fully riveted |
Time lapse:
Total upper forward fuselage installation rivets: 157
Total upper forward fuselage installation time: 42.9h