As the last items for the engine installation, I safety wired the heat control cables:
![]() |
| Heat control cables safety-wired in place |
then I attached the manifold pressure tubes from the intake up to the sensors:
![]() |
| Manifold pressure tubes connected to manifold and secured to bottom engine bracket |
![]() |
| Manifold pressure tubes attached to sensors and engine mount |
and that concludes section FF1.
Total engine installation rivets: 63
Total engine installation time: 41.2h



No comments:
Post a Comment