Engine installation wrapped up

As the last items for the engine installation, I safety wired the heat control cables:

Heat control cables safety-wired in place

then I attached the manifold pressure tubes from the intake up to the sensors:

Manifold pressure tubes connected to manifold and secured to bottom engine bracket

Manifold pressure tubes attached to sensors and engine mount

and that concludes section FF1.

Time lapse:


Total engine installation rivets: 63
Total engine installation time: 41.2h

No comments:

Post a Comment