After a LOT of sanding and filling, I got OK results (i.e. good enough that the paint shop can fix the rest :) ) on the horizontal stabilizer and elevator fairings, and primed them:
Sanding the elevator fairing gap |
Horizontal stabilizer and elevator fairings with primer applied |
Horizontal stabilizer and elevator fairings with primer applied |
I also riveted the bottom rudder fairing on, and now the sanding and filling for the rudder fairings will start.
Time lapse:
Total empennage fairing rivets: 175
Total empennage fairing time: 85.6h
No comments:
Post a Comment