The first 17 steps are all about preparing and match-drilling the bulkheads, so that's what I've been doing:
First two bulkhead sections |
Third bulkhead with doublers and HS attachment bracket |
Fourth and fifth bulkheads |
Sixth and last tailcone bulkhead |
On an unrelated note, I'm getting close to having more build hours than I have flight hours (I use the spreadsheet to track btw):
Even though I'm starting my commercial multiengine training, that'll probably happen soon anyway.
Time lapse:
Total tailcone time: 13.5h
No comments:
Post a Comment