Vertical stabilizer ready for priming/riveting

Match-drilled all the remaining vertical stabilizer holes, then deburred all of them (that's a lot of deburring) and countersunk the rear spar flange skin holes.

Shiny countersunk holes
Deburred skin holes
With this, the next step step is priming the parts before dimpling and riveting them. I'll make a separate post about primer (wars), but in summary I don't have any primer to do it right now, so the vertical stabilizer construction is halted until I do.

Timelapse as usual:


On the workshop, we added locking casters to the second workbench and attached the dimpler and rivet squeezer to it:



Total vertical stabilizer time: 25.7h
Total workshop time: ~24.0h