In the last episode about the fuel tanks, we attached them in a hurry before moving, and some of the skin edges were still overlapping with the adjacent parts. I finally got around to removing the tanks, filing them down and reattaching. I also took the opportunity to torque their bolts properly.
Torque seal on the fuel tank bolts
This (finally, really) concludes the work on the tanks.
And of course, I couldn't have done it without my wife's help and support:
zzzzZZZZZzzzz
Time lapse:
Total fuel tanks rivets: 30 Total fuel tanks time: 21.9h
No comments:
Post a Comment