Flaps

The only step to be done on the flaps section is attaching them. This starts by "press-fitting" (read: hammering in) some brass bushings:

Brass bushings in flap attachment

The attachment hardware goes through the bushings:

Flap attachment hardware

and the control hardware needs to be installed (but the actual control hookup only happens after the wings are attached to the fuselage):

Flap control attachment

Time lapse:



Total flaps rivets: 0!
Total flaps time: 0.7h

No comments:

Post a Comment