Hiatus, then vertical stabilizer completed

I had a brief hiatus while (1) waiting for more rivets to arrive; (2) spending some more time with my wife; (3) taking some vacation time traveling to Oshkosh Airventure:


I'll later post a summary of RV-relevant things I saw and found out at Airventure.
Now that I'm back and I have rivets, finishing the vertical stabilizer was pretty quick, and consisted of riveting the rear spar and the top and bottom ribs:





Minus some rough edges (hey, it was the first airplane part I ever built), I'm quite happy with the results, and eager to complete the next parts (rudder is not far from completion).

Time lapse:



Total vertical stabilizer time: 63.6h
Total vertical stabilizer rivets: 350

No comments:

Post a Comment