Damazio family's RV-10 project

Control cables installed in cabin

›
We attached the throttle and prop cables to the tunnel cover and the throttle quadrant levers: Throttle and prop cables secured to the tunne...

Coil pack and heat control cable installation

›
I secured the coil pack mount to the engine mount structure using a trimmed aluminum angle and Adel clamps: Coil pack bracket secured to ang...

Panel frame and glareshield cover installed

›
We fixed the rivet on the panel angle, which turned out to be due to the firewall angle hole being oversized - so we used a CR3243-4-4 overs...

Tunnel and other covers installed

›
Once the engine mount was in place, we could finally attach the floor covers: Forward floor cover panel installed I also opened a slot on t...

Aileron actuation final assembly

›
To finish up the aileron actuation section, I installed the main pushrods and the left bellcrank (the right bellcrank had been installed alo...

Left-side ZipTips installation

›
I followed the ZipTips manual I wrote for the left wingtip, using the hinge attachment method for the bottom side in order to properly groun...
›
Home
View web version
Powered by Blogger.