Forward fuselage access panels complete

We primed the access rings and covers, then riveted nutplates on the rings:

Access rings and covers primed and ready to install

Much later, while doing sealant for the tailcone top forward skin, we also riveted the access rings in place, and created the gasket for sealing the covers (so no water sips in through those openings):

Access rings riveted in place, applying/cleaning cover sealant

Covers in place with sealant, wrapped in plastic

Gaskets formed under covers

And that completes section OP-48 (minus final-attaching the covers in place).

Time lapse:


Total forward fuselage access panel rivets: 112
Total forward fuselage access panel time: 8.5h

Cabin cover riveting complete

We applied sealant and then riveted the tailcone top forward skin:

Tailcone top forward skin fully riveted (side view)

Tailcone top forward skin fully riveted (forward view)

With this, only the windows (and maybe some finishing of that cabin cover/skin joint) are left to complete this section.

Time lapse:


Total cabin cover rivets: 458
Total cabin cover time: 162.9h

Cabin cover edge finishing

We took some time to finish the edges around the door where the cabin cover was attached to the fuselage - priming, filling, sanding, priming, and finally painting them - with pretty good results that blend in well with the top part:

Priming the bottom cabin cover edge

Cabin cover edge after primer and paint

With this, the next steps on this section are riveting the tailcon top forward skin (which I'm waiting to finish the ground plane extension to do), final-attaching the center cabin brace (which depends on having the panel riveted on, which in turn depends on completing the firewall penetrations), and then the transparencies (those really should be a separate section).

Time lapse:


Total cabin cover rivets: 160
Total cabin cover time: 157.7h

Avionics mounting and tailcone ground plane

While I was down with COVID, I took the time to 3D print the new case for the AFR sensor controller - it was my first attempt at dual-extrusion printing, which resulted in big failures and a few lessons learned, including that sometimes it's just simpler to go with single extrusion :) eventually, I realized it was only $25 to have it printed professionally using MJF, so I did that instead.

Very poor attempt at printing the new AFR case myself with PC/ASA

Original Spartan3 case (left), my attempt (center), and MJF-printed version (right)

I also took the opportunity to update the Spartan3's firmware, which, annoyingly, requires a Windows device (or VM in my case):

Spartan3 connected to power and USB, for upgrading the firmware

I also made some progress on avionics attachments, including riveting the ECU brackets and then the GTR mount in the tailcone:

EFII ECU angle brackets

GTR20 mount with nutplates riveted on

GTR20 mount riveted in place

With the bracket in place, I used the inspection camera to check that the nutplates were clearing the bottom J channel, and they were - just barely:

Clearance between nutplate and J channel behind the GTR20 mount

I also made the firewall passthru holes for sensor and power wires:

Firewall wire penetrations

Rear side of firewall wire penetration

For the top COM antenna, I needed to expand the tailcone's ground plane a bit, so we marked and carved "slots" to run aluminum tape through as an extension:

Cabin cover marked for the ground plane extension

Carving the cabin cover for ground plane extension

Cabin cover with slots carved in for the ground plane extension

Next we'll install the aluminum tape in those slots and cover it back up with fiberglass strips - with that, we'll finally be able to rivet the tailcone top forward skin from section 43.

Time lapse:


Total avionics rivets: 124
Total avionics time: 109.3h

Cabin cover edge work

After attaching the cabin cover with resin/flox, it quickly became apparent that protecting the aluminum with tape was a bad idea, as some of the tape actually got caught underneath the resin, and it took us many hours to get it removed:

Tape caught between the cabin cover and underlying structure :(

After digging all the out, we then filled the gap around the edge at a right angle to the aluminum, with resin and microballoons/cab-o-sil (this time using just packing tape, which was pretty easy to remove), then sanded it until it was actually at a right angle:

Cabin cover edge, filled with resin/micro

Sanding the cabin cover edge filling

Cabin cover edge, sanded down to a right angle

We then started the finishing of these edges, filling them:

Filling holes in cabin cover edge filling

Next we need more sanding (and filling, and sanding, and filling, and sanding...) to fully finish the edges, then prime and paint them (the tape we used also removed a lot of the cheap rattle-can paint we used on the aluminum, so that needs to be re-covered).

Time lapse:


Total cabin cover rivets: 160
Total cabin cover time: 152.6h

Nose gear leg fairing re-do

I finished reinstalling the wheel after the fairing bracket, by securing the disk with safety wire:


I received the replacement nose gear leg fairing, and this time marked and cut the top opening in the right place (quadruple-checked before cutting :) ):

Template attached to nose gear leg fairing

Original nose gear leg fairing (top) and new one marked in the correct place (bottom)

The template is quite conservative, so it took many iterations of trimming 1/8" at a time until I got it to fully wrap around the gear leg nutplate brackets. I had to trim both the bottom where it contacts the nose wheel fairing, and the top edges to move it aft by about a 1/2" and up about 1/4":

Nose gear leg fairing clamped in place

Next, I followed the instructions a bit out of order - first, I match-drilled the screw holes to have a fixed position for the fairing. I did that by sanding the gel coat off in the area that the underlying bracket would be, which worked well for sighting the holes. This also allowed me to mark where the brackets were, for aligning and trimming the hinges.

Nose gear leg bracket hole visible through a sanded area of the fairing

I then drilled the hinges by the recommended spacing, clamped them to the fairing, and match-drilled from the inside:

Nose gear leg fairing with hinge match-drilled to it

Finally, I trimmed the hinges to avoid the brackets, and trimmed the bottom edge of the fairing to provide the required 3/16" clearance:

Fully trimmed nose gear leg fairing attached in place

With all that done, I countersunk the attachment holes, then primed the hinges and riveted the nutplates and hinges in place:

Nutplates attached to nose gear leg brackets

Nose gear leg fairing with hinges riveted to it

Slightly related, I noticed the tug was removing the paint (and at some point, would be primer) from the attachment point, so I cut some adhesive foam to protect it - it won't last forever either, but it's easy to replace later as needed:


With this, the only part of this section still left (for later) is the top intersection fairings, which will be better done after the wings are attached.

Time lapse:


Total gear leg and wheel fairing rivets: 53
Total gear leg and wheel fairing time: 110.8h

Cabin cover is attached!

In a major milestone, we finally attached the cabin cover for good.

Getting it in place was slightly annoying - we had to lower it to a raised position to get the conduits through to the tailcone before lowering it all the way:

Cabin cover slightly raised from position so as to give access to the conduits

Conduits run through to the tailcone

There was also some interference with the conduit area that had to be trimmed:

Interference between the bulkhead side channel and the conduit area

Trimmed conduit area for clearance

With those resolved, it was then time to rivet the gussets, apply resin/flox, and tighten the bolts for the first time (we realized some of them are a bit too long and needed too many washers, so I expect to still change them):

Side gusset riveted in place

Cabin cover gap filled with resin and flox

Gusset area with resin and tightened bolts

Once that cured, I riveted the aft portion of the cabin cover in place:

Riveted aft portion of the cabin cover

The tailcone top forward skin is still not on, mostly because we need to get some sealant for the forward edge before we can attach it.

Time lapse:


Total cabin cover rivets: 160
Total cabin cover time: 135.9h

Upper forward fuselage complete

I installed a nutplate to hold the center console side panel:

Nutplate to hold center console side panel

We used the windshield (even without trimming) to mark a line of the inside of the top forward skin so we want to apply primer/paint on it (and later do a first cut of the glareshield material to it):

Windshield in place to mark glareshield area

Forward fuselage top skin with glareshield area cleared of vinyl for primer 

Forward fuselage top skin being protected with tape in non-primed/painted areas

Painting the visible parts of the forward fuselage top skin

Primed and painted forward fuselage top skin

Forward fuselage structure assembled together

Forward fuselage structure riveted together

Cooling/defrost fan doublers riveted in place

Panel attachment flanges and nutplates riveted in place

With this, section 31 is complete, except for the bracket that holds engine cables which I'm not yet sure I'll need. Actually attaching the panel to the fuselage is part of the later section 41, which I'll do after the firewall layout is complete.

Time lapse:


Total upper forward fuselage rivets: 360
Total upper forward fuselage time: 65.2h